Bouret Dam

Completion Date : February 2021

The Bouret Dam Project consisted of the removal of an existing concrete dam and replacing it with a rock riffle system. A detailed water management plan was implemented so that river flows would by-pass the work area. This allowed crews the ability to removed the dam and the sediment could be excavated and exported to obtain a stable subgrade. Once the subgrade was established, a rock riffle system was installed which included various sizes of field stone rip rap and boulders. The project ultimately allowed upstream fish passage, improved river connectivity, and enhanced fish habitat.

PROJECT HIGHLIGHTS

  • Excavate and Export 1,500 CY of River Sediment
  • Import and Place 750 Ton of Granular Filter Aggregate
  • Import and Place 1,700 Ton of Base Rock
  • Import and Place 130 Large Boulders
  • Install 160 LF Sheet Pile Wall