Our Projects

PROJECTS

Let Rachel bring our Core Values to your
next Project. Integrity. Experience.
Creativity. Safety.

Gleason Fields

Completion Date : October 2022

Team Rachel was contracted through a publicly awarded project for the City of Maple Grove, with RJM Construction as the GC to turn the existing soccer and baseball fields into 4 new synthetic turf baseball/softball fields. Our contract included moving 50,000 CY of onsite material into 3 large berms, installing 3,800 LF of collector pipe, 16,500 LF of lay flat drain tile, 23 nyoplast storm structures, 31,000 SY of fabric, 15,000 Tons of base stone, & 3,000 Tons of finishing stone. Coordination has been a huge component to this project with all the different trades on site once mass grading was complete. The project has posed its fair share of challenges from gradation testing on the base & finish stone, & excess spoils generated on site from other trades with no more room in berms causing the need for an additional fourth berm.

PROJECT HIGHLIGHTS

  • 50,000 CY of Common Excavation
  • Install 3,800 LF of 12″ Diameter Collector Drain Tile
  • Install 16,500 LF of Lay Flat Drain Tile
  • Import 15,000 Tons of Base Stone from Martin Marietta
  • Import 3,000 Tons of Finishing Stone
  • Install 23 Nyoplast Storm Structures
  • Footing Excavation for Grandstands, Concessions, and Storage Building
  • Install 31,000 SY of Geotextile Fabric for Fields

Other Projects