Our Projects

PROJECTS

Let Rachel bring our Core Values to your
next Project. Integrity. Experience.
Creativity. Safety.

St. Germains Cabinet Facility

Completion Date : Spring 2019

Kraus Anderson teamed up with Rachel Contracting for the site work on the construction of a new 32,500 SF cabinet manufacturing facility and associated parking lot. The foundations for the new building are primarily a monolithic slab except the shipping/receiving area. This area has frost depth footings due to the lay of the land and construction of a loading dock. Although the site is primarily a fill site, there was some building excavation. Placement of high density rigid foam at the building perimeter was necessary. The site work included a new sanitary service, new water service utilizing an existing well, and a storm system including piping and a large clay lined storm pond. Rachel is also responsible for sidewalks, paving and parking lot striping, and a modular block retaining wall.

PROJECT HIGHLIGHTS

St. Germains Cabinet, Inc.

Duluth, MN

ENGINEER

AMI Consulting Engineers

Vadnais Heights, MN

GENERAL CONTRACTOR

Kraus Anderson

Minneapolis, MN

RACHEL PROJECT TEAM

  • Garrett Collins, Estimator
  • Mike Friend, Project Manager
  • Steve Collins, Project Superintendent
  • Joe Thompson, Foreman

PROJECT HIGHLIGHTS

  • Excavate & export over 12,000 CY common
  • 9,000 CY imported granular
  • 17,094 SF clay liner in Pond