Enbridge, Inc. along with North Dakota Pipeline Company LLC is building the 612 mile 24 and 30-inch Sandpiper Pipeline Project. The Project will transport light crude oil from Enbridge’s Beaver Lodge Station, near Tioga, North Dakota, through Clearbrook, Minnesota to an existing terminal in Superior, Wisconsin. Through this multi-billion dollar project, Rachel Contracting was selected for the Civil Mass Grading and Utility work for the Beaver Lodge Station location.
A project of this magnitude has several regulatory requirements that adds to the level of planning and executing in order to achieve and maintain the highest level of safety and overall quality. Rachel Contracting has stepped up to successfully complete their portion of work in 2014. In 2015, Rachel Contracting continued their efforts to complete this project and hand over to the client without incident. As a continuation, Rachel Contracting also was selected and provided contracts for several sites along this pipeline corridor and project. Maintaining a solid reputation for quality and safety ensures us future success with projects of this complexity and coordination.
PROJECT HIGHLIGHTS
- 150,000 CY–Mass Grading
- 15,000 Ton–Import Aggregates
- 2,000 LF–8″ DIP to 36″ RCP
- 40 MIL–HDPE Firewater Pond
- 2 Each–150′ Diameter Tank Site Foundations Mainline Pump Foundation
- 2 Each–Booster Pump and Transfer Pump Foundations
- 2 Each–ESB Foundations