Willmar Power Plant Demo

The decommissioning of the Willmar Power Plant started in October 2022 with environmental remediation including asbestos and regulated waste removal. Work included demolition of entire power plant including boilers, turbine generators, four steel smoke stacks, two coal silos, cooling towers, heat exchange building, coal conveyors and all associated underground utilities and operating equipment at the site. Extensive planning & coordination with the Owner occurred due the construction of the substation directly adjacent to the power plant. Site restoration included the backfilling of the power plant basement, installation of bioswale and import & placement of topsoil and seed over the disturbed areas. Site restoration also included new sidewalk, driveway, curb and bituminous pavement around the site.

Engineer

Braun Intertec Corporation

Project Highlights

  • Power Generating Station
  • Four Steel Smoke Stacks 40′, 42′, 35′, and 55′ above roof line
  • Two Coal Silos 24 feet diameter & 78 feet tall
  • Excavate and dispose of over 10,000 CY of unsuitable and contaminated soil
  • Import Granular Fill
  • Install 8,000 SF Bioswale
  • Site Restoration, Topsoil & Seed over 55,000 SF
  • Install new Sidewalk, Curb & Gutter